I have
- Install and wire the inertia switch. The wiring is there so all I have to do is drill two holes and terminate the switch connector.
- Mount and test the heater controls. This really means soldering two connections and connecting up the heater flap cable - then two screws to mount the controls.
- Finish and install sunvisors (added 14 Jan 2013).
Meanwhile house renovation is taking a fair bit of time.We're trying to get the bathroom painted before the end of this coming weekend. The heat (weather) may slow us down.
No comments:
Post a Comment